|
Re: Sprint 6C build up
Thanks guys for the engine removal hints - I hope to do that next week.
Here is the picture of the front cross member in position. I have "notched" it for the gearchange rod but that will need welding and a plate bolting across the top to regain the strength. I will also be plating and welding it to the B pillars. The repositioned alternator can also be seen bottom left.
|